| |
Past Projects
The wide scope of our company's capabilities is reflected in the
following descriptions of past projects. Of course, we can only
include a few examples here. So if you'd like information on other
projects, we'll be glad to provide it. On each job we've completed,
we have worked hard to offer our clients the optimum combination
of cost and quality. In a word: value.
|
|
 |
 |
 |
| Project
Name: |
3rd
Kiln Installation |
| Location: |
New
Wales, Florida |
| Owner: |
IMC
Global |
| Contact: |
Mr.
John Clements |
| Phone: |
(863)
428-7111 |
| |
|
Multi-discipline
project designed to increase animal feed production
capacity |
| |
|
Large,
multi-trade project almost entirely self performed
by MJW. |
| |
|
Kiln
was 150' long, set in two sections |
| |
|
Included
concrete piling, concrete foundations, steel erection,
equipment installation, and process piping |
|
|
|
|
 |
 |
 |
| Project
Name: |
Tiger
Bay Co-Gen Power Plant |
| Location: |
Fort
Meade, Florida |
| Owner: |
Florida
Power |
| Contact: |
Mark Cole
|
| Phone: |
(904)
353-5527 |
| |
|
234MW
Combined Cycle Plant |
| |
|
MJW
was design-build contractor for control and admininstration
buildings |
| |
|
MJW
self-performed the concrete fnds |
| |
|
MJW
self-performed the sheet piling |
| |
|
MJW
set the turbine generators |
|
|
|
|
 |
 |
 |
| Project
Name: |
Brewery
Expansion & Modernization |
| Location: |
Jacksonville,
Florida |
| Owner: |
Anheuser
Busch |
| Contact: |
Joe
Maglio |
| Phone: |
(904)
751-6505 |
| |
|
Project
greatly increased beer making capacity in Jacksonville |
| |
|
MJW
was GC for expansion |
| |
|
Self
Performed over 80% including pile driving, concrete,
steel erection, masonry, process piping, equipment
setting and utilities |
| |
|
Project
was completed in 14 months |
|
|
|
|
 |
 |
 |
| Project
Name: |
Barge
Unloading Terminal |
| Location: |
Jacksonville,
Florida |
| Owner: |
JEA |
| Contact: |
Mark
Cole |
| Phone: |
(904)
353-5527 |
| |
|
MJW
was concrete and piling contractor |
| |
|
Terminal
was designed to unload and transport coal to power
plant 3 miles away |
| |
|
MJW
drove hundreds of piling for 3 mile long conveyor. |
| |
|
Challenging
over water concrete work |
|
|
|
|
 |
 |
 |
| Project
Name: |
AMC
Woodlands Square |
| Location: |
Oldsmar,
Florida |
| Owner: |
Florida
Commercial Communities |
| Contact: |
Mr.
Richard Swann, Esq. |
| Phone: |
(407)647-2777 |
| |
|
MJW
was GC for 20 screen Mega-plex |
| |
|
Completed
in an existing shopping center over a water retention
vault |
| |
|
Full
stadium style seating |
| |
|
Utilized
100% union labor |
|
|
|
|
 |
 |
 |
| Project
Name: |
New
Finish Sugar Refinery |
| Location: |
Clewiston,
Florida |
| Owner: |
United
States Sugar Corp. |
| Contact: |
Mr.
Bill Raiola |
| Phone: |
(941)
902-2774 |
| |
|
First
new sugar refinery in over 30 years |
| |
|
MJW
was the mechanical contractor with an installed
contract of over $12 million |
| |
|
Included
37,000 LF of process piping |
| |
|
Installed
conveyors, tanks, pumps, sifters, screens, and
packaging equipment |
|
|
|
|
 |
 |
 |
| Project
Name: |
Main
Street Waste Water Treatment Plant |
| Location: |
Gainesville,
Florida |
| Owner: |
Gainesville
Regional Utilities |
| Contact: |
Mr.
Mike New |
| Phone: |
(352)
334-3400 |
| |
|
Two
year expansion of operating facility |
| |
|
Two
new, 113' square areation basins |
| |
|
Two
85' diameter claifiers |
| |
|
Self
performed concrete, utilities, pile driving, concrete,
masonry, equipment installation and piping |
|
|
|
|
 |
 |
 |
| Project
Name: |
Hamon
Cooling Towers |
| Location: |
Crystal
River, Florida |
| Owner: |
Florida
Power |
| Contact: |
Mark
Cole |
| Phone: |
(904)
353-5527 |
| |
|
Located
at Nuclear Power plant |
| |
|
MJW
completed the mechanical and piping package |
| |
|
All
nuclear quality and safety requirements |
|
|
|
|